Crosscheck

Your medical. Crosschecked.

Hydrocephalus

What the FAA's documents say about hydrocephalus, in plain words, with the FAA's own words one press away.

FAA term: Hydrocephalus (With or Without Shunt)Covers: All classes

FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

Show the FAA's words: which classes the FAA's table covers
HYDROCEPHALUS (With or Without Shunt) All Classes

FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  • Seizures and epilepsy

    Row A says if associated with a seizure, see the corresponding section, and that an additional recovery period may apply. Crosscheck has a page on seizures and epilepsy, written from the FAA's Seizure and Epilepsy tables.
  • Brain tumor

    Row A says if associated with a brain tumor, see the corresponding section. Crosscheck has a page on brain tumor, written from the FAA's Brain Tumor disposition table.
  • Brain bleed

    Row A says if associated with a brain bleed, see the corresponding section. Crosscheck has a page on brain bleed, written from the FAA's Brain Bleed disposition table.

Short version

The disposition table has two rows.

How the FAA's table sorts Hydrocephalus
SituationWhat the examiner doesPathway
Row AWith shunt placement
Defers to the FAA
Special Issuance
Row BWithout shunt placement, such as normal pressure hydrocephalus
Defers to the FAA
Special Issuance
Show the FAA's words: the FAA's table for Hydrocephalus
  1. Row A · Special Issuance

    Hydrocephalus with shunt placement. After a two (2) year symptom-free recovery period, the table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    A. With shunt placement … After a two (2) year symptom-free recovery period, submit the following for FAA review: … DEFER Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  2. Row B · Special Issuance

    Hydrocephalus without shunt placement (such as normal pressure hydrocephalus). The table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    B. Without shunt placement … (such as normal pressure hydrocephalus) … Submit the following for FAA review: … DEFER … Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  3. A note on the table, 1

    Row A says if associated with a seizure, brain tumor, or brain bleed, see the corresponding section, and an additional recovery period may apply.

    If associated with a seizure, brain tumor, or brain bleed – see the corresponding section. An additional recovery period may apply.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

What the pathway names mean

The FAA pathways for hydrocephalus

Which one describes yours?

The FAA's table sorts it these ways. Choose yours to see its plan.

Your step-by-step plan

  1. Step 1: Row A: the neurological evaluation

    With shunt placement, after a two-year symptom-free recovery period.Two things to bring
    • Neurological evaluation

      Within 90 days before the exam

      A current, detailed neurological evaluation that meets FAA Specifications for Neurologic Evaluation, from a clinic visit with your treating neurologist no more than 90 days before the exam.

    • The reason for the shunt, and whether it is functional

      Row A's next paragraph: it must specifically include the reason a shunt was placed and if the shunt is functional or non-functional.

      The row does not say what "it" refers to.

    Show the FAA's words: Row A: the neurological evaluation

    A current, detailed neurological evaluation that meets FAA Specifications for Neurologic Evaluation generated from a clinic visit with the treating neurologist no more than 90 days before the AME exam.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

    It must specifically include the reason a shunt was placed and if the shunt is functional or non-functional.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

    After a two (2) year symptom-free recovery period, submit the following for FAA review:

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

  2. Step 2: Row A: the shunt series CT or MRI brain

    Performed no more than 12 months before the exam.

    A shunt series CT or MRI brain performed no more than 12 months before the exam.

    How it is sent

    • Both the report and a copy of the images on CD in DICOM readable format, with a 'DICOMDIR' in the root directory of the CD-ROM
    • The CD verified to display the images before sending
    • Copies of all CDs or image (as printed) retained, as a safeguard if lost in the mail
    Show the FAA's words: Row A: the shunt series CT or MRI brain

    Shunt series CT or MRI brain performed no more than 12 months before the AME exam. Include both the report and a copy of the images on compact disc (CD) in DICOM readable format. (There MUST be a 'DICOMDIR' in the root directory of the CD-ROM). Please verify the CD will display the images before sending. Retain copies of all CDs or image as a safeguard if lost in the mail.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

  3. Step 3: If the FAA asks for more

    For Row A, after a review of the above information.

    May be required after a review of the above information.

    May be required after a review of the above information.

    A neuropsychological (NP) evaluation in accordance with the FAA Specifications for Neuropsychological Evaluations for Potential Neurocognitive Impairment.

    The table says it may be required after a review of the above information and due to the condition which caused the need for the shunt.

    Show the FAA's words: If the FAA asks for more

    Note: After a review of the above information and due to the condition which caused the need for the shunt, a Neuropsychological (NP) evaluation in accordance with the FAA Specifications for Neuropsychological Evaluations for Potential Neurocognitive Impairment may be required.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

  4. Step 4: A seizure, brain tumor, or brain bleed

    Where Row A's note points.

    Row A says if associated with a seizure, brain tumor, or brain bleed, see the corresponding section. An additional recovery period may apply.

    Show the FAA's words: A seizure, brain tumor, or brain bleed

    If associated with a seizure, brain tumor, or brain bleed – see the corresponding section. An additional recovery period may apply.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

  5. Step 5: See your AME

    After a two (2) year symptom-free recovery period, the table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.Exam day
    • After a two (2) year symptom-free recovery period, the table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.
    Show the FAA's words: See your AME

    A. With shunt placement

    After a two (2) year symptom-free recovery period, submit the following for FAA review:

    DEFER Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023; checked by Crosscheck 14 October 2026.

What the examiner checks

It depends on which row of the FAA's table describes the case.

  • Row ADefers to the FAASpecial Issuance

    After a two (2) year symptom-free recovery period, the table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    If the examiner defers
  • Row BDefers to the FAASpecial Issuance

    The table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    If the examiner defers
Show the FAA's words: what the examiner does on each row
  1. Row A · Special Issuance

    Hydrocephalus with shunt placement. After a two (2) year symptom-free recovery period, the table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    A. With shunt placement … After a two (2) year symptom-free recovery period, submit the following for FAA review: … DEFER Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  2. Row B · Special Issuance

    Hydrocephalus without shunt placement (such as normal pressure hydrocephalus). The table lists what to submit for FAA review, and the examiner defers and submits the information to the FAA for a possible Special Issuance.

    B. Without shunt placement … (such as normal pressure hydrocephalus) … Submit the following for FAA review: … DEFER … Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

If the examiner defersSpecial Issuance

The table marks Row A, with shunt placement, DEFER after a two (2) year symptom-free recovery period.

The table marks Row B, without shunt placement (such as normal pressure hydrocephalus), DEFER.

Show the FAA's words: if the examiner defers

When the examiner defers

  1. Reason 1

    The table marks Row A, with shunt placement, DEFER after a two (2) year symptom-free recovery period.

    A. With shunt placement … After a two (2) year symptom-free recovery period, submit the following for FAA review: … DEFER Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  2. Reason 2

    The table marks Row B, without shunt placement (such as normal pressure hydrocephalus), DEFER.

    B. Without shunt placement … (such as normal pressure hydrocephalus) … DEFER … Submit the information to the FAA for a possible Special Issuance.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

What a Special Issuance is

The Guide says an Authorization for Special Issuance, valid for a specified period, may be granted at the Federal Air Surgeon's discretion to a person who does not meet the established medical standards, if the person shows to the satisfaction of the Federal Air Surgeon that the duties authorized by the class of certificate applied for can be performed without endangering public safety during the period the Authorization would be in force.

How the FAA pathways work

Good to know

Points from the FAA's own documents that are easy to miss.

  • The reason for the shunt, and whether it is functional

    Row A reads, as a paragraph of its own after the neurological evaluation, that it must specifically include the reason a shunt was placed and if the shunt is functional or non-functional. The row does not say what "it" refers to.

    Show the FAA's words: good to know, 1
    It must specifically include the reason a shunt was placed and if the shunt is functional or non-functional.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  • The two rows date the imaging differently

    Row A's shunt series CT or MRI brain is from no more than 12 months before the exam. Row B's MRI and/or CT of the brain is from no more than 90 days before the exam.

    Show the FAA's words: good to know, 2
    Shunt series CT or MRI brain performed no more than 12 months before the AME exam. … 2. MRI and/or CT of the brain performed no more than 90 days before the AME exam.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  • Row A's recovery period is symptom-free

    For Row A the table's recovery period is two (2) years, and symptom-free, before what it lists is submitted for FAA review.

    Show the FAA's words: good to know, 3
    After a two (2) year symptom-free recovery period, submit the following for FAA review:

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

  • A seizure, brain tumor, or brain bleed has its own section

    Row A says if associated with a seizure, brain tumor, or brain bleed, see the corresponding section, and an additional recovery period may apply.

    Show the FAA's words: good to know, 4
    If associated with a seizure, brain tumor, or brain bleed – see the corresponding section. An additional recovery period may apply.

    FAA source: Hydrocephalus. FAA date 25 January 2023. Checked by Crosscheck 14 October 2026

FAA sources

Every FAA document this page relies on, with the FAA's own date and the date Crosscheck last read it. The documents to print open at the FAA, so they are always the FAA's current ones.

This reports what the FAA has published. It is not medical advice, and it does not say how the FAA or an examiner will decide a case.